Proposal for Phase 1A Housing Project at Berchang, Telang, Lipis

:

The project is located 10 km from Kuala Lipis, between Jalan Kuala Lipis and

Padang Tengku. The project components is:

            i. Single-storey terrace house (20’ x 70’) - 21 units

The expected duration of the project is between 2020-2022 (24 months).